How it works

Works beside what you run. Built at the desk where the work happens.

TrueFlo is not installed and switched on. It is built with the people who do the work, one desk and one check at a time, and every check is shown on real files before your team relies on it.

The product

The product, in five steps.

  1. 01

    Send what you have.

    You forward the emails or drop the files in a shared folder, and send the export your ERP already makes. No access to your inbox or your systems on day one.

  2. 02

    Learn your rules.

    The documents each destination needs. The set point and vent for each commodity. The price sheet. The rate sheets for freight, cold storage and inspection. Written down once, checked every time.

  3. 03

    Check everything that arrives.

    Each document, order, confirmation, remittance and bill is filed to its shipment and compared to the others and to the rules. What matches is filed quietly.

  4. 04

    Put a person on what doesn't.

    A mismatch shows both sources. A missing document gets a drafted request. A short-pay gets its evidence. A person approves, edits or dismisses.

  5. 05

    Every correction becomes a rule.

    When a person overrides a check, TrueFlo records why. Once your team approves the change, the next shipment is checked against the better rule.

Who approves what

It prepares the decision. A person makes it.

What TrueFlo preparesWho approvesWhere it lands
Shipping desk
CompareThe mismatch between two documents, with both pages side by sideDocumentation coordinatorThe shipment file, and the corrected document goes out
RequestA request for a missing certificate, with the shipment, the cutoff and what is missingShipping coordinatorWaits for a person to press send
CheckA booking that disagrees with your commodity rule, with the rule and both sourcesLogisticsA drafted correction to the carrier, waiting for a person
Order desk
DraftA sales order drafted from a buyer's PO nobody keyedSales supportThe ERP, after a person approves it
CompareThe invoice that bills more than was loaded, with both documentsSales supportCorrected before it goes out, after a person approves
Finance desk
GatherA short-pay with the bill of lading, the temperature record and the proof of delivery pulled togetherAccounts receivableA drafted reply to the buyer, or a credit memo for approval
FlagA freight bill that is off its quote or rate confirmation, with the differenceAccounts payableHeld for a person to review
Working with TrueFlo

One desk, one check, then the next.

Built with a US produce exporter, on its real paperwork.

  1. 01

    Agree the number first.

    Before anything is set up, we agree on the number that decides if TrueFlo stays. You keep your rules, written down.

  2. 02

    Map the desk.

    We sit with the coordinator, the sales desk or the AR clerk for a few days and write down how a shipment, an order or a payment actually moves, with the documents and the systems it touches.

  3. 03

    Build against a normal week.

    TrueFlo is set up on the files that arrived that week. Every check is shown on real documents, and the team says which ones were right.

  4. 04

    Run, and keep improving.

    Then the same work moves to the next check, the next desk and the next rule. We stay on. You get the system, the rules and the documentation.

Bring one shipment that went wrong.

Thirty minutes with our team on the paperwork behind it, and how TrueFlo makes it the last one.

TrueFlo demo30 min · with the TrueFlo team

Bring: one shipment that went wrong, with its paperwork

Book a demo

Times in Pacific time

Book 30 minutes and bring one shipment that went wrong. We'll walk the paperwork with you and show you what would have caught it.